|
 |
|
|
|
|
|
 |
|
Type: |
FPSO |
|
Size: |
273,000 DWT |
| Storage
Capacity: |
1,600,000 bbls |
| Water
depth: |
1340 m |
| Field: |
Golfinho |
| Lease
period: |
7 years |
| Uptime
record: |
N/A |
| Number of risers: |
| 8 x 6" production |
| 8 x 4" gas lift |
| 5 x 6" water injection |
| 1 x 9" gas export |
| 14 x umbilicals |
|
| Swivel stack: |
| 2 x 12" production |
| 1 x 12" test |
| 2 x 6" gas (incl. 1 spare) |
| 1 x E&I |
| 1 x HP/LP |
| 1 x 10" fire water |
| 1 x 10" water injection |
|
| Date First
Oil: |
May 2006 |
|
|
Max throughput: |
100,000 bbls oil per day |
| Number
of wells: |
6 + 2 (future) |
| Gas
injection: |
N/A |
| Gas
lift: |
122 MMSCFD |
| Water
injection: |
138,000 bbls water per day |
|
|
|
|
| |
|