|
 |
|
|
|
|
|
 |
|
Type: |
FSO |
|
Size: |
159,000
DWT |
| Storage
Capacity: |
1,000,000
bbls |
| Water
depth: |
32
m |
| Field: |
Piltun-Astokhskoye,
Sakhalin |
| Lease
period: |
4½ years + 4 years extension |
| Uptime
record: |
95%
|
| Number of risers: |
1
x 8"
|
| Swivel stack: |
1 x 8" oil |
| Date First
Oil: |
| 1 July 1999 |
| |
| Note: |
| SALM Mooring system designed to lay down on sea bed through winter months |
|
|
|
Max throughput: |
110,000
bbls oil per day |
| Number
of wells: |
N/A |
| Gas
injection: |
N/A |
| Gas
lift: |
N/A |
| Water
injection: |
N/A |
|
|
|
|
| |
|